Young’s Petroleum Start-Up Checklist
Air Conditioning Start-Up:
- Switch “on” power to outside unit at least 24 hours prior to start-up.
- Check power switch to furnace or blower unit and breaker, must be in the “on” position.
- Set thermostat dial to desired temperature and turn switch to “cool.” Set fan switch to “auto.”
If System Fails to Operate Properly
- Be sure power to unit is on.
- Check thermostat for proper setting.
- Check for blown fuse or tripped circuit breaker.
- Call our service department.
Heating Start-Up
- Check power switch to heater and breakers must be in the “on” position.
- Set thermostat dial to desired temperature and turn switch to “heat.”
If System Fails to Operate Properly
- Check thermostat for proper setting.
- Be sure power to unit is on.
- Check for blown fuse or tripped circuit breaker.
- Check tank gauge on oil tank. (Oil systems only.)
- Rest primary control. (Oil systems only. Usually located on top of burner. Push only once.)
- Call our service department.
24 Hour Emergency Service: (215) 234-4351
HIC#: PA2113