topbar
start-up checklist

Young’s Petroleum Start-Up Checklist

Air Conditioning Start-Up:

top
  • Switch “on” power to outside unit at least 24 hours prior to start-up.
  • Check power switch to furnace or blower unit and breaker, must be in the “on” position.
  • Set thermostat dial to desired temperature and turn switch to “cool.” Set fan switch to “auto.”
bottom

If System Fails to Operate Properly

top
  • Be sure power to unit is on.
  • Check thermostat for proper setting.
  • Check for blown fuse or tripped circuit breaker.
  • Call our service department.
bottom

Heating Start-Up

top
  • Check power switch to heater and breakers must be in the “on” position.
  • Set thermostat dial to desired temperature and turn switch to “heat.”
bottom

If System Fails to Operate Properly

top
  • Check thermostat for proper setting.
  • Be sure power to unit is on.
  • Check for blown fuse or tripped circuit breaker.
  • Check tank gauge on oil tank. (Oil systems only.)
  • Rest primary control. (Oil systems only. Usually located on top of burner. Push only once.)
  • Call our service department.
bottom

24 Hour Emergency Service: (215) 234-4351

HIC#: PA2113

bottom